March 21, 2012

Wallpaper Removal

We worked in this house last summer to remove wallpaper from their kitchen and dining room walls.  In the fall, they had some water damage in two of the three bedrooms on the 2nd floor, so we were called back in to make some repairs.  The ceilings in both bedrooms were a mess, and there was old dark wallpaper on the walls.  We were called back in to make the rooms nice again.

Here are some photos of the wallpaper and ceiling damage:




 This is quite an impressive improvement:


 


March 17, 2012

Repair and Paint #2

The owner of this house contacted me last year to paint his entire house.  Considering all of the repairs, it would have been a daunting and expensive task.  So, he put it off until last week.  We repaired and painted 2 bedrooms, the 3rd floor hallway, and a bathroom.  He had high a high velocity ducts and soffits installed in those areas that needed to be finished.  Plus there was damage to the seams in almost every corner.  Here are a couple of photos of the bedrooms with the wall damage that we had to repair.

Before
After

Before
After



March 12, 2012

The Painting of an Entire House


The new owner of this 1,800 sq. ft. house had a general contractor renovate it.  They put in 3 new bathrooms, a new kitchen, mostly new ceilings, new baseboards, and new doors among other things.  The owner did not like the GC's painter, so he chose me instead.

It is very difficult to express in pictures and words everything that goes into painting and entire house.  My team of 4 people and I spent 7 days painting every surface of this house.  We painted every ceiling, wall, door, baseboard, and trim.  Here are the before and after photos:

Living Room Before (looking into kitchen) 
Living Room After

Basement Before
Basement After

Bedroom 1 Before

Bedroom 1 After

Bedroom 2 Before
Bedroom 2 After

Hallway before
Hallway After

 We clean up and walk away from this kind of job really satisfied with the project. 


February 17, 2012

Entire House Repair


 The previous owners of this house were investors.  They bought the house for their son while he went to Penn.  He, of course, had housemates and they lived there for several years.  This was not a rental, but it was not an owner/occupied house.  I think this is a great investment for parents, but a terrible way to take care of a house.

The current owner wanted to make it his house, and it took a lot of work.  He refinished the floors and took out all of the baseboard heaters.  Then it was our job to make everything look great.

Before

After

Damage from old baseboard heater

After

There were 8 areas like the above that we repaired, plus the old paint was peeling everywhere.  Two of us spent 2 days repairing the walls before anything got painted.  We repaired just about every surface in this house and painted everything.  In the end, this was a very gratifying job.



February 10, 2012

New bathroom

This person gutted an entire house in the Society Hill section of Philadelphia.  It's a modest house of 1,800 square feet, and it's currently being finished by other contractors.  I am contracted to paint everything in March, but the owner did me a favor by asking me paint the bathroom before the plumbers finished their work.  Bathrooms are the hardest rooms in the house to paint.  No one likes squeezing in to paint behind a toilet or claw foot tub.  There could be many uncomfortable angles and spaces.  So, we were able to prime and paint an empty bathroom with brand new walls today.  It doesn't get much easier than this.



February 9, 2012

Surprise

This room was decorated in the 1970's with wood paneling and foam ceiling tiles.  Then a serious smoker lived there for decades.  The room was dark, filled with nicotine and tar stains, and seemed to be sloping towards the back of the house. 
Please excuse the fuzziness of this image.  The camera seemed to focus on dust on the lens.  I did not know until I downloaded it.  I'm sure you'll get the idea anyway. 

Our job was to take down the tiles, install drywall on the studs, and paint the entire room.  However, as soon as we took down the tiles, we got our surprise.  The ceiling framing was angled and attached only at the sides of the room, which was approximately 10.5' x 12.5'.  All of the beams were spanning 10' and were not attached anywhere except at the ends.  I could not attach drywall to studs that were not attached to the ceiling.

So, we took down the framing and saw that the paneling did not go to the ceiling.  The homeowner did not want to take down the paneling and the 50's wallpaper behind it, so we had to lower the ceiling.  To get it to take the weight of the drywall, we re-used some of the old framing and attached it to the existing ceiling studs.  This brought it down 1.5 inches, but it was still not enough in a few parts.  So, I put in larger crown molding.

After some heavy duty primer and 2 coats of paint, the room was completely transformed.  It's much brighter, more secure, and 6" higher.



February 2, 2012

After the Flood

This is the 3rd time these folks called me to do work in their house.  After Hurricane Irene in August 2011, they found that their basement bedroom carpet was kind of squishy.  So, they had someone remove the carpet, about 14" of studs and drywall, and the baseboards.

I came in to get their walls back in order.  They do the painting, so these pictures may not be as impressive as I want them to be.

Before
After

Before
After 

 I don't know what is wrong with my camera.  For some reason the walls look darker in the after pictures.