For example, when they had their air conditioner installed, the installers left the ceiling looking like this:
So, I closed in a portion with drywall and created a hatch to enter the attic. Then we painted the ceiling, walls, trim, and doors
We cleaned it all up and painted it.
The final thing we did was make everything match. Many of the doors were painted and needed some repairs. Others were not painted at all.
So, since we were painting the ceilings, walls, and trim on the 3rd floor, we made all of the doors in the house match.
We worked on this house over 18 months and 3 phases to make a true transition.